Understanding Simulation Solutions to Resource Constrained Project Scheduling Problems with Stochastic Task Durations
Department
Civil Engineering
Document Type
Article
Publication Title
Engineering Management Journal
ISSN
2377-0643
Volume
10
Issue
4
DOI
10.1080/10429247.1998.11415002
First Page
5
Last Page
13
Publication Date
12-1-1998
Abstract
The project scheduling problem domain is an important research and applications area of engineering management. Recently introduced project scheduling software such as Risk+, @Risk for Project, SCRAM and Risk Master have facilitated the use of simulation to solve project scheduling problems with stochastic task durations. Practitioners, however, should be made aware that the solution algorithm used in these software systems is based on the implicit assumption of perfect information, an assumption that jeopardizes the feasibility of solution results. This paper discusses the impact of assuming perfect information, introduces a multi-period stochastic programming based model of the project scheduling problem with stochastic task durations, and presents an alternative simulation algorithm that does not assume the availability of perfect information. A simple case study is used to illustrate the practical implications of applying simulation to address project scheduling problems with stochastic task durations.
Recommended Citation
Fernandez, A. A.,
Armacost, R.,
&
Pet-Edwards, J.
(1998).
Understanding Simulation Solutions to Resource Constrained Project Scheduling Problems with Stochastic Task Durations.
Engineering Management Journal, 10(4), 5–13.
DOI: 10.1080/10429247.1998.11415002
https://scholarlycommons.pacific.edu/soecs-facarticles/134