XYZ Tractor Company New Site Development and Administration Design
Format
SOECS Senior Project Demonstration
Faculty Mentor Name
Gary Litton
Abstract/Artist Statement
The XYZ Tractor Company is considering relocating their facility to a new location, 1234 Scraper Way, French camp, CA 95201. The proposed project will include the grading plan for a 35 acre site, a 15,000 SF administrative building design, and have an associated storm water detention system. The administration building will be designed using steel members and trusses. The building will be properly designed to withstand loading, such as wind, seismic, rain, dead, and live loads, using specifications according to the International Building Code 2008. The storm water detention system will include underground storage and pipes that meet the requirements according to San Joaquin County. The water runoff will be determined using the rational method (Water Resources application for determining runoff). A cost analysis will be performed using standard construction estimating guidelines and references.
Location
School of Engineering & Computer Science
Start Date
3-5-2008 2:00 PM
End Date
3-5-2008 3:30 PM
XYZ Tractor Company New Site Development and Administration Design
School of Engineering & Computer Science
The XYZ Tractor Company is considering relocating their facility to a new location, 1234 Scraper Way, French camp, CA 95201. The proposed project will include the grading plan for a 35 acre site, a 15,000 SF administrative building design, and have an associated storm water detention system. The administration building will be designed using steel members and trusses. The building will be properly designed to withstand loading, such as wind, seismic, rain, dead, and live loads, using specifications according to the International Building Code 2008. The storm water detention system will include underground storage and pipes that meet the requirements according to San Joaquin County. The water runoff will be determined using the rational method (Water Resources application for determining runoff). A cost analysis will be performed using standard construction estimating guidelines and references.